Modernizing Puerto Rico’s Power Grid
Modern and efficient energy grids require regular upgrades to ensure and improve reliability, resilience, flexibility, and security—and to integrate more sources of electricity and storage. In Puerto Rico, decades of underinvestment in the electric power grid combined with impacts from extreme weather events and other natural hazards has resulted in the need for significant upgrades.
This page highlights a selection of ongoing and planned programs and projects to repair, remediate, and stabilize Puerto Rico’s energy grid. Some efforts will be funded by the U.S. Federal Emergency Management Agency (FEMA) and others by LUMA Energy’s budget. These projects are detailed in the FEMA 5-Year Plan, Fiscal Years 2025-29, a report that presents LUMA’s infrastructure investment plan for the next five years.
Grid Modernization Programs and Projects
Sections below provide more information on each program, including program description, goal and progress where stated, allocated funding amount, funding source, performance period, and project status (number of projects initiated [initial scopes of work submitted]; number of detailed project scopes submitted; and number of projects under construction or completed [obligated]).
Vegetation Clearing
Vegetation Management
Keeping vegetation away from power lines is essential to maintaining safe and reliable electric service. In fact, vegetation contact is one of the leading causes of power outages on the island. The chart below shows the number of miles of power lines that have been cleared of vegetation.
Not all power lines are the same, and the data includes three main categories:
- 38 kV lines – These are medium-voltage distribution lines that deliver electricity from substations to local areas, neighborhoods, and towns.
- 115 kV and 230 kV lines – These are high-voltage transmission lines that move large amounts of electricity over long distances, typically from power plants to substations where the voltage is reduced for local use.
- kV (kilovolt) – This unit measures the electric potential of the line. Higher voltage lines can carry more electricity and transmit it over longer distances with less energy loss.

Summaries FY2025 Report
The “miles cleared” column shows the amount of line that has already been cleared of vegetation. It is important to note that most of the vegetation clearing efforts to date have focused on distribution lines. The “federally funded” column indicates how much of this work was financed using federal recovery funds.
These efforts are essential to reduce the risk of power outages and improve the stability of Puerto Rico’s electric grid, especially during storms or extreme weather events. Regular vegetation management helps ensure electricity reaches homes, schools, hospitals, and businesses across the island without unnecessary interruptions.
| FY2025 YTD Miles Cleared | ||
|---|---|---|
| Voltage by Line | Federally Funded | Total Miles |
| Distribution | 106 | 836 |
| 38 kV | 0 | 76 |
| 115 kV | 0 | 497 |
| 230 kV | 0 | 308 |
| Total | 106 | 1717 |
| FY2025 Q4 Miles Cleared | ||
|---|---|---|
| Voltage by Line | Federally Funded | Total Miles |
| Distribution | 37 | 268 |
| 38 kV | 0 | 14 |
| 115 kV | 0 | 144 |
| 230 kV | 0 | 50 |
| Total | 37 | 476 |
| FY2025 Q3 Miles Cleared | |||
|---|---|---|---|
| Voltage by Line | Federally Funded | Total Miles | |
| Distribution | 3 | 179 | |
| 38 kV | 0 | 17 | |
| 115 kV | 0 | 98 | |
| 230 kV | 0 | 123 | |
| Total | 3 | 417 | |
| FY2025 Q2 Miles Cleared | |||
|---|---|---|---|
| Voltage by Line | Federally Funded | Total Miles | |
| Distribution | 42 | 177 | |
| 38 kV | 0 | 15 | |
| 115 kV | 0 | 142 | |
| 230 kV | 0 | 77 | |
| Total | 42 | 410 | |
| FY2025 Q1 Miles Cleared | |||
|---|---|---|---|
| Voltage by Line | Federally Funded | Total Miles | |
| Distribution | 24 | 212 | |
| 38 kV | 0 | 30 | |
| 115 kV | 0 | 113 | |
| 230 kV | 0 | 58 | |
| Total | 24 | 413 | |
- Work to mitigate immediate vegetation risk, prioritizing areas that have the greatest impact to system reliability
- Ongoing efforts to clear and re-establish rights of way (the cleared pathways under transmission lines) to standard widths
- An immediate response for the highest risk sites that pose hazards to public safety or routinely experience tree-caused service interruptions.
| Est. Cost: | $1,201,000,00 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022–FY 2029 |
| Project Status: | Vegetation has been cleared from 66 miles of powerlines as part of vegetation management operations as described in LUMA’s Vegetation Management Progress Report. |
Transmission Line Rebuild
- Modeling the transmission lines to verify system needs
- Upgrading all sizes of lines
- “Hardening” the system to withstand extreme events
- Rebuilding towers that connect the lines and reinforcing or replacing parts required
- Burying select transmission lines underground (called “undergrounding”) for reliability and redundancy
- Repairing the underground cable in the San Juan area.
| Est. Cost: | $3,414,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY2022-FY2034 |
| Project Status: | 43 projects initiated; 26 detailed project scopes submitted; one project under construction |
Distribution Line Rebuild
| Est. Cost: | $4,160,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY2022-FY2034 |
| Project Status: | 25 projects initiated; 25 detailed project scopes submitted; 0 projects under construction |
Substation Rebuild
- Hardening and modernizing substations
- Making upgrades to conform to the latest codes, industry standards, and practices
- Replacing electromechanical and electronic relays
- Relocating or mitigating substations in flood-prone areas
- Deploying new substations to meet industry standards.
| Est. Cost: | $2,319,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022–FY 2034 |
| Project Status: | 64 projects initiated; 40 detailed project scopes submitted; 19 projects under construction or completed. This includes portions or entire rebuilds of six of the seven most critical substations, as well as other key substation repairs across Puerto Rico. |
Advanced Metering Infrastructure Implementation Program
| Est. Cost: | $877,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022–FY 2029 |
| Project Status: | Project obligated and underway. On Dec. 17, 2024, LUMA announced the selection of vendor Itron, a global leader in smart meter technology, to install 1.5 million across Puerto Rico. The installation will begin in the San Juan region and extend island-wide over the next three years. See press release here. |
Distribution Streetlighting
Program: This program focuses on upgrading and replacing streetlights based on their criticality. Along with increasing the number of streetlights in service, this program will include replacing streetlights with light-emitting diode (LED) lamps and entering data on the location of all streetlights. Through this program, LUMA will complete a physical audit of the streetlights, assign unique identifiers, update the billing system to ensure the cost is billed accurately to customers, and communicate with customers on corrections to the streetlighting system.
| Est. Cost: | $1,007,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022 – FY 2034 |
| Project Status: | 114 projects initiated; 87 detailed project scopes submitted; 30 projects under construction or completed |
Learn more about this program and review progress on these websites:
- Streetlights back in service by year and region as well as monthly LED replacements are shown in LUMA’s Nov. 2024 quarterly report.
- As of December 2024 LUMA have modernized nearly 134,500 streetlights through its federally funded program of Community Streetlight Initiative” and more than 31,000 through its Operations and Maintenance program “Back in Service”. Between both programs LUMA has already impacted all 78 municipalities in Puerto Rico.
Distribution/Grid Automation
- Automatic switching distribution feeder automation systems and automated switchgear (three-phase and single-phase reclosers),
- Communicating fault sensors on distribution feeders to provide fault location information to Operations to improve service restoration times for customers
- Communication components and system tools to enable remote operation and visualization of the field devices.
| Est. Cost: | $877,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022 – FY 2034 |
| Project Status: | Five projects initiated; 16 detailed project scopes submitted; 0 projects under construction or completed |
Distribution Pole and Conductor Repair
Program: This program focuses on minimizing the safety hazard caused by distribution poles and conductors that need to be repaired or replaced. Critical pole repairs and replacements are prioritized based upon the results of an inspection of the distribution system and an analysis by engineers. Following critical repairs and replacements, safety hazard poles will be replaced, along with damaged conductor and hardware
Goal: Improving safety for customers and employees, as well as reduce the frequency and duration of outages experienced.
| Est. Cost: | $669,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022 – FY 2034 |
| Project Status: | 111 projects initiated; 98 detailed project scopes submitted; 88 projects under construction or completed |
LUMA’s Nov. 2024 article on Progress Toward Critical Infrastructure Improvements indicates that 2,700 broken or failing utility poles have been repaired or replaced.
Transmission Priority Pole Replacement
| Est. Cost: | $171,000,000 |
| Funding Source: | FEMA Public Assistance and Hazard Mitigation Programs |
| Est. Duration: | FY 2022 – FY 2029 |
| Project Status: | 28 projects initiated; 11 detailed project scopes submitted; six projects under construction or completed |
Municipal Project: Vieques and Culebra Microgrids
A separate project—fully funded by FEMA’s Hazard Mitigation Grant Program—will develop microgrids for the islands of Vieques and Culebra, which are connected to the main grid by an undersea cable. The microgrids, which will be able to function independently from the main grid, include a 12.5-megawatt solar-based system for Vieques and another 3-megawatt system for Culebra. The grids aim to increase power generation capabilities and leverage renewable energy through solar panels, making the project more sustainable.
Read more on the Puerto Rico Fiscal Agency & Financial Advisory Authority’s (AAFAF’s) update on FEMA’s greenlight of the Vieques-Culebra solar microgrid project.
Resources
For more information on grid modernization projects for Puerto Rico, view:
- Puerto Rico Energy Bureau’s (PREB’s) Puerto Rico Electric Power and Renewable Energy (PREPARE) Dashboard, Transmission and Distribution System section
- LUMA’s Planned Upgrade Projects Map
- LUMA’s Building a Better Energy Future for Puerto Rico: Progress Dashboard including overall project counts and information about upgrades, improvements, and equipment replacements
- FOMB – Certified PREPA 2025 Fiscal Plan